How Merlin Greenspace is built
6–8 mm
FRP shell thickness
~76 kg/m²
Light enough for two people to carry a module
1.30 m
Length added per module ring
3 people
Crew to raise the arches, no crane
up to 80%
Recycled PET in the resin
The system in one section
Nine layers, from the slab to the grass.
Schematic, not to scale. Layer thicknesses and soil depth are set by the engineer for each site.
In the factory
Each module is laid by hand in a precision mould.

Illustration.

Illustration.
- Mould and gel coat. The mould is prepared and coated with a flame-retardant gel coat, which becomes the smooth white inner face of the building.
- Hand lamination. Chopped-strand and stitched glass-fibre mats are laid with a core and wetted out with polyester resin containing up to 80% recycled PET, with a mineral flame-retardant filler in the mix.
- Demould and finish. The cured module is released, trimmed, its flanges drilled for bolts, and top-coated.
- Ship flat. Modules nest inside each other, so a whole building travels in a fraction of the volume of the finished structure.
The vault: straight walls to 1.20 m, an arch rising to 3.50 m, up to 5.86 m wide inside, extended in 1.30 m steps. Window and door modules from 1 m to 4.56 m wide close the ends.
On site
Eight steps from bare ground to a planted roof.

Illustration.

Illustration.

Illustration.
1 · Ground and slab
A geotechnical check, then a perfectly level reinforced slab with a run beam under every wall module. Plumbing goes in the slab as in any building.
2 · Raise the arches
A crew of three holds each module at marked heights and bolts it to the next with stainless bolts every 20–25 cm. Hand tools, stepladders and height poles; no crane.
3 · Bond and anchor
Flanges are bedded in polyurethane adhesive, tightened top-down, aligned, then anchored to the slab and grouted.
4 · Close the ends
Glazed and door modules go in. They are structural, stiffening the vault as well as letting in light.
5 · Seal and flood-test
Every joint is taped and every bolt coated. The shell is then water-tested for leaks before anything covers it.
6 · Insulate and wrap
Spray insulation as the climate needs, a second elastomeric seal, then an HDPE membrane over the whole shell as a root barrier.
7 · Drain and berm
A perimeter French drain, then berms built up in levels: a stabilised sand-cement core behind a sloped face of soil bags.
8 · Soil and planting
Geocell mesh holds the slopes, soil goes on the roof, then turf or native planting with irrigation. Interiors are finished once the soil has settled.
Engineering and testing
Tested in the lab. Engineered for each site.
The shell has been tested by independent laboratories, and the system has been structurally designed to international codes for real projects. Every new Greenspace building is engineered again for its own site, soil, wind and use.
Laminate strength
Independent structural laboratory, New Zealand, 2017. Design tensile strength 13.5 MPa and design bending strength 40.6 MPa for the FRP laminate, plus the strength of the bolted flange joint.
Full-scale load test
Independent laboratory, Spain, 2016–17. An 8.6 × 6.3 m module, under a soil bed, carried about 230 kg/m² of added load, with a maximum deflection of 22.75 mm.
Watertightness
Same laboratory: 48 hours of continuous sprinkling, about 33,500 litres of water on the roof, with no damp stains or leaks detected.
Structural design to code
Project calculations to IBC 2012 and ASCE 7-10 (115 mph design wind, Seismic Design Category C) and to the New Zealand loading standards, with anchors checked under ACI 318.
Results are summarised from the laboratory reports and engineering calculations. Full reports are shared with your engineer or consultant on request.
Fire safety
Specified for every project, approved locally.
The laminate is made with a flame-retardant gel coat and a mineral flame-retardant filler, and once finished the shell sits under earth on its roof and sides.
Fire performance is set for each building with your consultant: interior linings, fire-rated coatings where the use calls for them, escape routes and suppression. The design is then submitted to the local Civil Defence authority with the project.
Approvals
Engineered and permitted where it's built.
Codes and permits differ by emirate, use and site. We work with your local engineer and consultant so the structure, foundations, fire strategy and services are designed and submitted correctly for your project.
Authority approvals stay with the client, as set out in our turnkey scope.
Built in the UAE
Already standing here.
- A one-bedroom unit at our research site in the Sharjah Research, Technology & Innovation Park.
- Vaulted structures at Masdar City, Abu Dhabi.
- A research growing lab for an agricultural research institute, completed in 2020.
- Guest units in Al Ain and Hatta, 2022.
The engineering pack
For your engineer, consultant or authority submission, we share:
- Laboratory test reports: laminate, load and watertightness
- Structural calculations and FEM analysis
- Building and installation manual
- Technical data sheet
- Material safety data sheet
- Waterproofing and roof method statements
- Cross-section and material specification
- Turnkey scope and quotation
Illustrations show each step; they are not photographs of a specific project.